I'm trying to get away from the constant long breaks, lunches, wasted time, cheating hours, etc. I want to put them on piece rate. For a 1 story, 4/12 pitch, 1 layer shingle, renail plywood and dry in with 30 lb. What's a good rate? I'm in Florida near Tampa. I supply all the tools, trucks, equipment. And I pay the dump fee.


Top
 Profile  
 
  Post subject: Re: Tear off by the sq.
PostPosted: Wed Feb 15, 2012 10:33 pm 
Offline
User avatar

Joined: Mon Dec 27, 2010 3:12 pm
Posts: 472
Images: 0
Location: VERMONT
Post liked: 55 times
Liked posts: 55 times
It amazes me how Employees consider their worth compared to their value- when the better you treat them the more they stretch advantage and do less.

A couple days ago I had a conversation with another Roofing Contractor and he is onto something.

This is his story: Had three crews on the books. Switched these three crews to the responsibility of the Foreman (who is now a sub) and has set cost per job before the Foreman gets to the job. The foreman doesn't run materials, run estimates or calculate jobs, just get them done the way they were trained initially.

Materials this guys price and profit/ overhead. Seems too easy. The alliance to this response to your post is this- when the productivity slips in the form of timing, that crew gets shifted to third on call and they know it so the foreman- who is directly responsible for the pay to his crew. Still Roofing Contractors tools, and trucks so the Foreman is still locked in. This may be the best "Checks and Balances" I've ever heard- in this business.


BTW he set up the Foremen with Insurances so they are legit- so he said, and not the point.


Top
 Profile Personal album  
 
  Post subject: Re: Tear off by the sq.
PostPosted: Thu Feb 16, 2012 2:52 am 
Offline
User avatar

Joined: Fri May 14, 2010 2:33 pm
Posts: 2024
Images: 20
Location: 417-573-636-314
Post liked: 334 times
Liked posts: 366 times
mrroofer wrote:
I'm trying to get away from the constant long breaks, lunches, wasted time, cheating hours, etc. I want to put them on piece rate. For a 1 story, 4/12 pitch, 1 layer shingle, renail plywood and dry in with 30 lb. What's a good rate? I'm in Florida near Tampa. I supply all the tools, trucks, equipment. And I pay the dump fee.


Pricing varies.Since your in Florida I would p.m roof lover.There are other Florida contractors/roofers here but roof lover is the most active and I am pretty sure he is in your area.

_________________
The only limits in life are those you put on yourself."Go Big Or Go Home"


Top
 Profile Personal album  
 
  Post subject: Re: Tear off by the sq.
PostPosted: Thu Feb 16, 2012 1:15 pm 
Offline
User avatar

Joined: Fri Mar 02, 2007 3:50 pm
Posts: 1380
Location: Westchester, N.Y.
Post liked: 11 times
Liked posts: 151 times
"I'm trying to get away from the constant long breaks, lunches, wasted time, cheating hours, etc. I want to put them on piece rate."

Spend more time on the job?...

_________________
"Democracy is the theory that the common people know what they want, and deserve to get it good and hard." ~H. L. Mencken



A user likes this :
roofersmith (Tue Feb 21, 2012 2:57 pm)
Top
 Profile  
 
  Post subject: Re: Tear off by the sq.
PostPosted: Thu Feb 16, 2012 2:27 pm 
Offline
User avatar

Joined: Sat Nov 28, 2009 8:21 am
Posts: 1103
Images: 0
Location: Kamloops, BC, Canada
Post liked: 90 times
Liked posts: 92 times
In my area of BC, Canada a per square roofer can expect around $8 - $12 per square (1 layer, 4/12) just for tearing off and cleaning up. Papering is part of the install price which can be around $25 -$35 per square. Go down to Vancouver and guys get upwards of $50-$60 per square installed, but their cost of living is twice as much.

How is the quality of the work your guys are doing now? It may decline once you start paying per square. But if they are a prideful bunch then you should see efficiency increase along with productivity, while keeping a high standard of quality.

_________________
Almost 100 years ago, injured workers rights were taken away, it's high time we got them back.


Top
 Profile Personal album  
 
  Post subject: Re: Tear off by the sq.
PostPosted: Thu Feb 16, 2012 9:17 pm 
Offline

Joined: Mon Aug 18, 2008 8:36 pm
Posts: 870
Location: florida
Post liked: 114 times
Liked posts: 24 times
They are my employees.I pay __ minimum and i pay their workmans comp.
they provide their own tools and transportation.
I work on the job all day long for free.
My men love me. Never stealing materials,tools or disgruntled over a difficult section. No fighting, cursing, loud radios.
Just one hundred percent realiability and all smiles.
In 6 years, not one man has asked for a single dollar before pay day.

Whenever i hire a native, its pure hell.
Bad attitude, work sucks beyond all hell.
2 hour lunches, Phone glued to ear.
Comes to work late. Leaves home way before dark.
Very disgruntled if he has to work till dark
wife/girlfriend has an emergency .almost every day
Needs a ride to his drug dealer
No driver license, wanted for child support
on the run half the time.
Oh and needs pay after the first day of work and has no lunch money ever.
Whens beer thirty?
Yeah, we raise em up right around here...
Im exagerating a lil, but barely. lol

Before all the regulations and inspections(2007)
shortly after the democrats won control of the house and senate(2006)
Labor was around 40 and material was Half the price.


Top
 Profile  
 
  Post subject: Re: Tear off by the sq.
PostPosted: Thu Feb 16, 2012 10:09 pm 
Offline

Joined: Wed Jun 11, 2008 8:25 pm
Posts: 273
Post liked: 5 times
Liked posts: 7 times
[quote="Tar Monkey"]"I'm trying to get away from the constant long breaks, lunches, wasted time, cheating hours, etc. I want to put them on piece rate."

Spend more time on the job?...[/quot

That's funny, Im not gonna even answer that. Thanks for the help.


Top
 Profile  
 
  Post subject: Re: Tear off by the sq.
PostPosted: Thu Feb 16, 2012 10:23 pm 
Offline

Joined: Sun May 04, 2008 3:27 pm
Posts: 937
Post liked: 0 time
Liked posts: 41 times
7 years ago I was your foreman. I got a $100 per sq. off & on, cash. The GC took care of everything, I took care of getting the roof off & on & paying my guys. I supplied the equipment & labor, the GC supplied a dump truck or container. Sometimes I made out, sometimes I didnt. He paid the same whether it was a go over or if it was a 3 layer pig rip.


Top
 Profile  
 
  Post subject: Re: Tear off by the sq.
PostPosted: Fri Feb 17, 2012 8:47 am 
Offline

Joined: Sun Jul 18, 2010 8:56 pm
Posts: 129
Location: Central Coast Ca.
Post liked: 1 time
Liked posts: 6 times
My foreman is responsible for the progress of the roof job. I regularly inspect the jobsite if I see the guys not doing there jobs I have a firm talk with the foreman inturn he has a talk to the crew. Bad performance and I replace guys that way they know I dont play around. good performance I'll give my foreman a bonus for that job or treat the guys to lunch to let them know that I appreciate there hard work. I also make sure they are reminded that everone is replaceable. A crew should work at a steedy and constant pace all day with you being there or not.

_________________
2nd Gen. roofing contractor.
"Work hard, Play harder"


Top
 Profile  
 
  Post subject: Re: Tear off by the sq.
PostPosted: Fri Feb 17, 2012 1:49 pm 
Offline
User avatar

Joined: Fri Mar 02, 2007 3:50 pm
Posts: 1380
Location: Westchester, N.Y.
Post liked: 11 times
Liked posts: 151 times
mrroofer wrote:
That's funny, Im not gonna even answer that. Thanks for the help.


Regardless of whether you find my advice humorous or not, it would actually solve every single problem you listed. A roofing crew is like a wolf pack, if you want control you need to be the biggest baddest wolf, period. Changing the way your guys get paid to try and solve issues caused by lax management is just going to piss them off and make them resentful. You are taking the lazy way out here imo and in the long run it won't better your situation because your issue isn't pay, it's lack of respect.

_________________
"Democracy is the theory that the common people know what they want, and deserve to get it good and hard." ~H. L. Mencken



A user likes this :
-Axiom- (Fri Feb 17, 2012 3:23 pm)
Top
 Profile  
 
  Post subject: Re: Tear off by the sq.
PostPosted: Fri Feb 17, 2012 7:52 pm 
Offline

Joined: Wed Jun 11, 2008 8:25 pm
Posts: 273
Post liked: 5 times
Liked posts: 7 times
You couldnt be further off of the problem. Quite the opposite. Please don't respond to this thread, I was already given very good advise from the other posters. Thank you.


Tar Monkey wrote:
mrroofer wrote:
That's funny, Im not gonna even answer that. Thanks for the help.


Regardless of whether you find my advice humorous or not, it would actually solve every single problem you listed. A roofing crew is like a wolf pack, if you want control you need to be the biggest baddest wolf, period. Changing the way your guys get paid to try and solve issues caused by lax management is just going to piss them off and make them resentful. You are taking the lazy way out here imo and in the long run it won't better your situation because your issue isn't pay, it's lack of respect.


Top
 Profile  
 
  Post subject: Re: Tear off by the sq.
PostPosted: Fri Feb 17, 2012 8:45 pm 
Offline
User avatar

Joined: Fri Mar 02, 2007 3:50 pm
Posts: 1380
Location: Westchester, N.Y.
Post liked: 11 times
Liked posts: 151 times
mrroofer wrote:
You couldnt be further off of the problem. Quite the opposite. Please don't respond to this thread, I was already given very good advise from the other posters. Thank you.





Translation: You hit the nail right on the head. It's making me angry. I was already told what I wanted to hear from the other posters. Thank You.

_________________
"Democracy is the theory that the common people know what they want, and deserve to get it good and hard." ~H. L. Mencken


Top
 Profile  
 
  Post subject: Re: Tear off by the sq.
PostPosted: Fri Feb 17, 2012 10:02 pm 
Offline

Joined: Wed Jun 11, 2008 8:25 pm
Posts: 273
Post liked: 5 times
Liked posts: 7 times
Ok, your right. :wink:


Top
 Profile  
 
  Post subject: Re: Tear off by the sq.
PostPosted: Fri Feb 17, 2012 10:08 pm 
Offline
User avatar

Joined: Mon Jan 09, 2006 3:59 am
Posts: 1812
Location: newark, ny
Post liked: 1 time
Liked posts: 9 times
Tar i also disagree with your advice to an extent. For a mom & pop operation your advice works perfectly. But for some of us bigger guys who have multiple crews & do hundreds of roofs per year. If i'm on the job....who's running the company?

_________________
www.marshallexteriorsny.com



A user likes this :
kage (Sat Feb 18, 2012 2:01 am)
Top
 Profile  
 
  Post subject: Re: Tear off by the sq.
PostPosted: Sat Feb 18, 2012 2:03 am 
Offline

Joined: Sun Aug 10, 2008 8:30 pm
Posts: 2666
Images: 11
Location: BC
Post liked: 117 times
Liked posts: 77 times
bcdemon wrote:
In my area of BC, Canada a per square roofer can expect around $8 - $12 per square (1 layer, 4/12) just for tearing off and cleaning up. Papering is part of the install price which can be around $25 -$35 per square. Go down to Vancouver and guys get upwards of $50-$60 per square installed, but their cost of living is twice as much.

.

:shock: ...what planet ARE you from???? no wonder you dont have a business..you would be bankrupt...

_________________
WHATS A HOUSE WITHOUT A ROOF!?!
Steeper The Better!!Image


Top
 Profile Personal album  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 45 posts ]  Go to page 1, 2, 3  Next


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to:  


Disclaimer

The information and advice provided by the community are for informational purposes only. The site owner and users assume no liability for any errors or misunderstanding in the content, or for any actions taken in reliance thereon. Before making any decisions or taking any action, it is recommended that you consult with a local roofing professional or building official. Roofing can be hazardous. Make sure you protect yourself by using all the appropriate safety procedures.